Market Notices

144103RESERVE NOTICE17/05/2026 10:41:04 AM

STPASA - Cancellation of the Forecast Lack Of Reserve Level 2 (LOR2) in the QLD Region on 19/05/2026

AEMO ELECTRICITY MARKET NOTICE

The Forecast LOR2 condition in the QLD region advised in AEMO Electricity Market Notice No. 144093 is cancelled at 1030 hrs 17/05/2026.

Manager NEM Real Time Operations
     
144100INTER-REGIONAL TRANSFER17/05/2026 01:48:30 AM

Inter-Regional Transfer limit variation - Murraylink

AEMO ELECTRICITY MARKET NOTICE

Inter-Regional Transfer limit variation - Murraylink

There has been an unplanned outage of Murraylink.

The following constraint set was invoked at 0145 hrs 17/05/2026

I-ML_ZERO

The constraint set contains the following interconnector on the left hand side.

V-S-MNSP1

Refer to AEMO Network Outage Scheduler (NOS) for further details.

Manager NEM Real Time Operations
     
144097INTER-REGIONAL TRANSFER16/05/2026 08:49:36 PM

Inter-regional transfer limit variation - Murraylink Redcliffs Convertor station - VIC region - 16/05/2026

AEMO ELECTRICITY MARKET NOTICE

Inter-regional transfer limit variation - Murraylink Redcliffs Convertor station - VIC region - 16/05/2026

At 2045 hrs 16/05/2026 there was a short notice outage of Murraylink Redcliffs Convertor station.

The following constraint set(s) invoked at 2045 hrs 16/05/2026
I-MURRAYLINK

This constraint set(s) contains equations with the following interconnectors on the LHS.
VIC1-NSW1,V-S-MNSP1

Refer to the AEMO Network Outage Scheduler for further information.

Manager NEM Real Time Operations
     
144094INTER-REGIONAL TRANSFER16/05/2026 07:20:55 PM

Inter-Regional Transfer limit variation - Murraylink

AEMO ELECTRICITY MARKET NOTICE

Inter-Regional Transfer limit variation - Murraylink

There has been an unplanned outage of Murraylink.

The following constraint set was invoked at 1915 hrs 16/05/2026

I-ML_ZERO

The constraint set contains the following interconnector on the left hand side.

V-S-MNSP1

Refer to AEMO Network Outage Scheduler (NOS) for further details.

Manager NEM Real Time Operations
     
144093RESERVE NOTICE16/05/2026 04:47:27 PM

STPASA - Forecast Lack Of Reserve Level 2 (LOR2) in the QLD Region on 19/05/2026

AEMO ELECTRICITY MARKET NOTICE

AEMO declares a Forecast LOR2 condition under clause 4.8.4(b) of the National Electricity Rules for the QLD region for the following period:

[1.] From 0600 hrs 19/05/2026 to 1930 hrs 19/05/2026.
The forecast capacity reserve requirement is 760 MW.
The minimum capacity reserve available is 605 MW.

AEMO is seeking a market response.

AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.


Manager NEM Real Time Operations
     
144085INTER-REGIONAL TRANSFER15/05/2026 03:19:58 PM

Inter-regional transfer limit variation - Directlink - NSW region - 15/05/2026

AEMO ELECTRICITY MARKET NOTICE

Inter-regional transfer limit variation - Directlink No. 2 Leg - NSW region - 15/05/2026

A planned outage of Directlink No. 2 Leg in the NSW region was scheduled from 0700 hrs 11/05/2026 to 1600 hrs 18/05/2026.

The outage has been completed and Directlink No. 2 Leg returned to service at 1410 hrs 15/05/2026

Constraint set(s) revoked: N-MBTE_1

Manager NEM Real Time Operations
     
144075INTER-REGIONAL TRANSFER13/05/2026 03:27:42 PM

Inter-regional transfer limit variation - Tailem Bend - South East No.1 275 kV Line - SA region - 13/05/2026

AEMO ELECTRICITY MARKET NOTICE

Inter-regional transfer limit variation - Tailem Bend - South East No.1 275 kV Line - SA region - 13/05/2026

A planned outage of Tailem Bend - South East No.1 275 kV Line in the SA region was scheduled from 0800 hrs 13/05/2026 to 1830 hrs 13/05/2026.

The outage has been completed and Tailem Bend - South East No.1 275 kV Line returned to service at 1520 hrs 13/05/2026

Constraint set(s) revoked: S-X_TBSE+BDBU; S-BC_CP

Manager NEM Real Time Operations
     
144064INTER-REGIONAL TRANSFER08/05/2026 05:55:46 AM

Inter-regional transfer limit variation - Armidale No.3 330/132 kV Transformer - NSW region - 08/05/2026

AEMO ELECTRICITY MARKET NOTICE

Inter-regional transfer limit variation - Armidale No.3 330/132 kV Transformer - NSW region - 08/05/2026

At 0508 hrs 08/05/2026 there was an unplanned outage of Armidale No.3 330/132 kV Transformer.

The following constraint set(s) invoked at 0515 hrs 08/05/2026
N-AR_TX

This constraint set(s) contains equations with the following interconnectors on the LHS.
N-Q-MNSP1

Refer to the AEMO Network Outage Scheduler for further information.

Manager NEM Real Time Operations
     
144047INTER-REGIONAL TRANSFER05/05/2026 02:30:24 AM

Inter-Regional Transfer limit variation - Directlink - NSW Region

AEMO ELECTRICITY MARKET NOTICE

Inter-Regional Transfer limit variation - Directlink - NSW Region

There has been an unplanned outage of the No 3 Leg of Directlink .

The following constraint set was invoked at 0230hrs 05/05/2026

N-MBTE_1

The constraint set contains the following interconnector on the left hand side.

N-Q-MNSP1

Refer AEMO Network Outage Scheduler (NOS) for further details.