Inter-regional transfer limit variation - Directlink - NSW region - 15/05/2026
Inter-regional transfer limit variation - Directlink No. 2 Leg - NSW region - 15/05/2026
A planned outage of Directlink No. 2 Leg in the NSW region was scheduled from 0700 hrs 11/05/2026 to 1600 hrs 18/05/2026.
The outage has been completed and Directlink No. 2 Leg returned to service at 1410 hrs 15/05/2026
Constraint set(s) revoked: N-MBTE_1
Manager NEM Real Time Operations
Inter-regional transfer limit variation - Tailem Bend - South East No.1 275 kV Line - SA region - 13/05/2026
Inter-regional transfer limit variation - Tailem Bend - South East No.1 275 kV Line - SA region - 13/05/2026
A planned outage of Tailem Bend - South East No.1 275 kV Line in the SA region was scheduled from 0800 hrs 13/05/2026 to 1830 hrs 13/05/2026.
The outage has been completed and Tailem Bend - South East No.1 275 kV Line returned to service at 1520 hrs 13/05/2026
Constraint set(s) revoked: S-X_TBSE+BDBU; S-BC_CP
Manager NEM Real Time Operations
Inter-regional transfer limit variation - Armidale No.3 330/132 kV Transformer - NSW region - 08/05/2026
Inter-regional transfer limit variation - Armidale No.3 330/132 kV Transformer - NSW region - 08/05/2026
At 0508 hrs 08/05/2026 there was an unplanned outage of Armidale No.3 330/132 kV Transformer.
The following constraint set(s) invoked at 0515 hrs 08/05/2026
N-AR_TX
This constraint set(s) contains equations with the following interconnectors on the LHS.
N-Q-MNSP1
Refer to the AEMO Network Outage Scheduler for further information.
Manager NEM Real Time Operations
Inter-Regional Transfer limit variation - Directlink - NSW Region
Inter-Regional Transfer limit variation - Directlink - NSW Region
There has been an unplanned outage of the No 3 Leg of Directlink .
The following constraint set was invoked at 0230hrs 05/05/2026
N-MBTE_1
The constraint set contains the following interconnector on the left hand side.
N-Q-MNSP1
Refer AEMO Network Outage Scheduler (NOS) for further details.
Manager NEM Real Time Operations
STPASA - Cancellation of the Forecast Lack Of Reserve Level 1 (LOR1) in the TAS Region on 05/05/2026
The Forecast LOR1 condition in the TAS region advised in AEMO Electricity Market Notice No. 144025 is cancelled at 1500 hrs 02/05/2026.
Manager NEM Real Time Operations
STPASA - Forecast Lack Of Reserve Level 1 (LOR1) in the TAS Region on 05/05/2026
AEMO declares a Forecast LOR1 condition under clause 4.8.4(b) of the National Electricity Rules for the TAS region for the following period:
[1.] From 0730 hrs 05/05/2026 to 0800 hrs 05/05/2026.
The forecast capacity reserve requirement is 577 MW.
The minimum capacity reserve available is 561 MW.
AEMO Operations
Inter-regional transfer limit variation - Dumaresq-Sapphire (8J) 330 kV Line - NSW region - 01/05/2026
Inter-regional transfer limit variation - Dumaresq-Sapphire (8J) 330 kV Line - NSW region - 01/05/2026
A planned outage of Dumaresq-Sapphire (8J) 330 kV Line in the NSW region was scheduled from 1430 hrs 01/05/2026 to 1530 hrs 01/05/2026.
The outage has been rescheduled for 0940 hrs 01/05/2026 to 1040 hrs 01/05/2026.
The following constraint set(s) invoked at 0940 hrs 01/05/2026
N-DMSR_8J
N-X_8J+DM+TW_SVC
N-SAPHWF1_ZERO
This constraint set(s) contains equations with the following interconnectors on the LHS.
NSW1-QLD1,T-V-MNSP1,N-Q-MNSP1,V-S-MNSP1,V-SA
Refer to the AEMO Network Outage Scheduler for further information.
Manager NEM Real Time Operations
Inter-regional transfer limit variation - QNI Interconnector - NSW region - 29/04/2026
Inter-regional transfer limit variation - QNI Interconnector - NSW region - 29/04/2026
At 1740 hrs 29/04/2026 based on advise received from the TNSP, the QNI Interconnector has been further restricted during the outage of Armidale - Sapphire 8E 330kV Line.
The outage is scheduled for 0700 hrs 26/04/2026 to 1700 hrs 02/05/2026.
The following constraint set(s) invoked at 1740 hrs 29/04/2026
I-QN_550
This constraint set(s) contains equations with the following interconnectors on the LHS.
NSW1-QLD1
Refer to the AEMO Network Outage Scheduler for further information.
Manager NEM Real Time Operations
PDPASA - Cancellation of the Forecast Lack Of Reserve Level 1 (LOR1) in the SA Region on 28/04/2026
The Forecast LOR1 condition in the SA region advised in AEMO Electricity Market Notice No. 144006 is cancelled at 0155 hrs 28/04/2026.
Manager NEM Real Time Operations