PDPASA - Cancellation of the Forecast Lack Of Reserve Level 2 (LOR2) in the SA Region on 26/02/2026
The Forecast LOR2 condition in the SA region advised in AEMO Electricity Market Notice No. 133931 is cancelled at 1415 hrs 26/02/2026.
Manager NEM Real Time Operations
PDPASA - Forecast Lack Of Reserve Level 2 (LOR2) in the SA Region on 27/02/2026
AEMO declares a Forecast LOR2 condition under clause 4.8.4(b) of the National Electricity Rules for the SA region for the following Period:
[1.] From 1730 hrs 27/02/2026 to 2030 hrs 27/02/2026.
The forecast capacity reserve requirement is 409 MW.
The minimum capacity reserve available is 307 MW.
AEMO is seeking a market response.
AEMO has not yet estimated the latest time at which it would need to intervene through an AEMO intervention event.
Manager NEM Real Time Operations
Inter-regional transfer limit variation - Directlk_Q Terranora 9901 110kV LINE - NSW region - 12/02/2026
Inter-regional transfer limit variation - Directlk_Q Terranora 9901 110kV LINE - NSW region - 12/02/2026
At 1030 hrs 12/02/2026 there was a short notice outage of Directlk_Q Terranora 9901 110kV LINE.
The following constraint set(s) invoked at 1230 hrs 12/02/2026
N-X_MBTE_3
This constraint set(s) contains equations with the following interconnectors on the LHS.
N-Q-MNSP1
Refer to the AEMO Network Outage Scheduler for further information.
Manager NEM Real Time Operations
PDPASA - Cancellation of the Forecast Lack Of Reserve Level 2 (LOR2) in the SA Region on 10/02/2026
The Forecast LOR2 condition in the SA region advised in AEMO Electricity Market Notice No. 133452 is cancelled at 2030 hrs 10/02/2026.
Manager NEM Real Time Operations
PDPASA - Forecast Lack Of Reserve Level 2 (LOR2) in the SA Region on 10/02/2026
AEMO declares a Forecast LOR2 condition under clause 4.8.4(b) of the National Electricity Rules for the SA region for the following Period:
[1.] From 2100 hrs 10/02/2026 to 2130 hrs 10/02/2026.
The forecast capacity reserve requirement is 362 MW.
The minimum capacity reserve available is 308 MW.
AEMO is seeking a market response.
AEMO has not yet estimated the latest time at which it would need to intervene through an AEMO intervention event.
Manager NEM Real Time Operations
PDPASA - Cancellation of the Forecast Lack Of Reserve Level 2 (LOR2) in the NSW Region on 11/02/2026
The Forecast LOR2 condition in the NSW region advised in AEMO Electricity Market Notice No. 133446 is cancelled at 1640 hrs 10/02/2026.
Manager NEM Real Time Operations
PDPASA - Update of the Forecast Lack Of Reserve Level 2 (LOR2) in the NSW Region on 11/02/2026
The Forecast LOR2 condition in the NSW region advised in AEMO Electricity Market Notice No. 133443 has been updated at 1408 hrs to the following:
[1.] From 1830 hrs 11/02/2026 to 1900 hrs 11/02/2026.
The forecast capacity reserve requirement is 1041 MW.
The minimum capacity reserve available is 1037 MW.
AEMO is seeking a market response.
AEMO has not yet estimated the latest time at which it would need to intervene through an AEMO intervention event.
Manager NEM Real Time Operations
PDPASA - Forecast Lack Of Reserve Level 2 (LOR2) in the NSW Region on 11/02/2026
AEMO declares a Forecast LOR2 condition under clause 4.8.4(b) of the National Electricity Rules for the NSW region for the following Period:
[1.] From 1730 hrs 11/02/2026 to 1900 hrs 11/02/2026.
The forecast capacity reserve requirement is 1016 MW.
The minimum capacity reserve available is 915 MW.
AEMO is seeking a market response.
AEMO has not yet estimated the latest time at which it would need to intervene through an AEMO intervention event.
Manager NEM Real Time Operations
Inter-regional transfer limit variation - Mudgeeraba No 5 275/110kV transformer - QLD region - 09/02/2026
Inter-regional transfer limit variation -Mudgeeraba No 5 275/110kV transformer - QLD region - 09/02/2026
At 0801 hrs 09/02/2026 there was an unplanned outage of Mudgeeraba No 5 275/110kV transformer.
The following constraint set(s) invoked at 0805 hrs 09/02/2026
Q-MUTX
This constraint set(s) contains equations with the following interconnectors on the LHS.
N-Q-MNSP1
Refer to the AEMO Network Outage Scheduler for further information.
Manager NEM Real Time Operations