Market Notices

144110MINIMUM SYSTEM LOAD17/05/2026 02:42:23 PM

Cancellation of [Forecast, Actual]Minimum System Load (MSL) MSL1 event in the SA Region on 17/05/2026.

AEMO ELECTRICITY MARKET NOTICE

Cancellation of [Forecast, Actual]Minimum System Load (MSL) MSL1 event in the SA Region on 17/05/2026.

Cancellation - [Forecast, Actual]MSL1- SA Region at 1430 hrs 17/05/2026.

Refer to Market Notice 144105for MSL1.

Manager NEM Real Time Operations
     
144105MINIMUM SYSTEM LOAD17/05/2026 01:17:19 PM

Forecast Minimum System Load MSL1 condition in the SA Region on 17/05/2026

AEMO ELECTRICITY MARKET NOTICE
Forecast Minimum System Load MSL1 condition in the SA Region on 17/05/2026

AEMO has detected that there is an elevated risk of insufficient demand to maintain a secure operating state in the SA on 17/05/2026.

Minimum System Load (MSL) conditions are forecast when demand is less than the relevant MSL threshold. The advisory MSL thresholds are:
- MSL1: 603 MW
- MSL2: 328 MW
- MSL3: 113 MW

The demand is forecast to be below the MSL1 threshold for the following period[s]:
- From 1300 hrs 17/05/2026 to 1400 hrs 17/05/2026. Minimum demand is forecast to be 576 MW at 1400 hrs.


Forecast demand refers to forecast Operational Demand that excludes contribution from Significant Non-Scheduled Generation: see definitions at https://aemo.com.au/energy-systems/electricity/national-electricity-market-nem/data-nem/operational-demand-data .
AEMO is seeking a market response.
AEMO has not yet estimated the latest time it would need to intervene through an AEMO intervention event.


Manager NEM Real Time Operations
     
144069GENERAL NOTICE09/05/2026 06:04:42 PM

Network Augmentation Commissioned - NSW Region - 09 May 2026

AEMO ELECTRICITY MARKET NOTICE

A network augmentation has been commissioned in the NSW Region.

At 1740 hrs the following equipment was commissioned.

Wagga - Dinawan 6L 330 kV Line
Wagga - Dinawan 6J 330 kV Line
Dinawan 330 kV A and B Buses

Manager NEM Real Time Operations
     
144024GENERAL NOTICE01/05/2026 09:58:31 AM

Fast Frequency Response Market - Local dispatch of Very Fast Contingency FCAS in QLD

AEMO ELECTRICITY MARKET NOTICE

Following a review of the operation of the Very Fast FCAS market, from 5th May 2026 AEMO will increase the cap on dispatch of Very Fast Contingency FCAS in the QLD region from 200 MW to 250 MW, during periods where islanding of the QLD region is considered credible.

No other changes to the dispatch of Very Fast FCAS or FCAS constraint equations will be made on this date.

For more information on the Fast Frequency Response (FFR) initiative, please visit:
https://www.aemo.com.au/initiatives/major-programs/fast-frequency-response

AEMO Operations
     
141139MINIMUM SYSTEM LOAD18/04/2026 02:15:11 PM

Cancellation of ActualMinimum System Load (MSL) MSL1 event in the SA Region on 18/04/2026.

AEMO ELECTRICITY MARKET NOTICE

Cancellation of ActualMinimum System Load (MSL) MSL1 event in the SA Region on 18/04/2026.

Cancellation - ActualMSL1- SA Region at 1405 hrs 18/04/2026.

Refer to Market Notice 141138 for MSL1.

Manager NEM Real Time Operations
     
141138MINIMUM SYSTEM LOAD18/04/2026 12:35:23 PM

Actual Minimum System Load MSL1 condition in the SA Region on 18/04/2026

AEMO ELECTRICITY MARKET NOTICE
Actual Minimum System Load MSL1 condition in the SA Region on 18/04/2026

AEMO has detected that there is an elevated risk of insufficient demand to maintain a secure operating state in the SA on 18/04/2026.

The advisory MSL thresholds are:
- MSL1: 54 MW
- MSL2: -97 MW
- MSL3: -448 MW

The demand is below the MSL1 threshold.

Demand refers to Operational Demand that excludes contribution from Significant Non-Scheduled Generation: see definitions at https://aemo.com.au/energy-systems/electricity/national-electricity-market-nem/data-nem/operational-demand-data .

Manager NEM Real Time Operations
     
141068GENERAL NOTICE14/04/2026 07:34:16 PM

Update - Vulnerable lines in Tas region

AEMO ELECTRICITY MARKET NOTICE.

Update - Lightning vulnerable lines in Tas region

Refer to AEMO Electricity Market Notice 141036

At 1357hrs 11/04/2026 the Farrell -Tribute 220 kV line and Farrell - John Butters 220kV Line tripped.

The cause of the trip was identified as due to lightning.
In accordance with SO_OP_3715, AEMO now considers the Farrell -Tribute 220 kV line and the Farrell - John Butters 220kV line to be vulnerable with a category of probable due to lightning.

Manager NEM Real Time Operations
     
140916MINIMUM SYSTEM LOAD04/04/2026 01:52:03 PM

Cancellation of Actual Minimum System Load (MSL) MSL1 event in the SA Region on 04/04/2026.

AEMO ELECTRICITY MARKET NOTICE

Cancellation of Actual Minimum System Load (MSL) MSL1 event in the SA Region on 04/04/2026.

Cancellation - Actual MSL1- SA Region at 1350 hrs 04/04/2026.

Refer to Market Notice 140894 for MSL1.

Manager NEM Real Time Operations
     
140894MINIMUM SYSTEM LOAD04/04/2026 12:43:13 PM

Actual Minimum System Load MSL1 condition in the SA Region on 04/04/2026

AEMO ELECTRICITY MARKET NOTICE
Actual Minimum System Load MSL1 condition in the SA Region on 04/04/2026

AEMO has detected that there is an elevated risk of insufficient demand to maintain a secure operating state in the SA on 04/04/2026.

The advisory MSL thresholds are:
- MSL1: 68 MW
- MSL2: -83 MW
- MSL3: -344 MW

The demand is below the MSL1 threshold.

Demand refers to Operational Demand that excludes contribution from Significant Non-Scheduled Generation: see definitions at https://aemo.com.au/energy-systems/electricity/national-electricity-market-nem/data-nem/operational-demand-data .



Manager NEM Real Time Operations
     