AEMO is consulting on the ST PASA replacement project in two stages, Consultation 1 and Consultation 2, to ensure relevant parties have adequate opportunity to engage on the extensive changes to the ST PASA process and procedures.
Consultation 1 was completed in October 2025 with development of a new ST PASA Procedure and minor amendments to the Reliability Standard Implementation Guideline.
This consultation (Consultation 2) considers the reserve level declaration guidelines and the proposed application of uncertainty measures to load forecasting. Consequential amendments to the supporting procedures will also be a part of Consultation 2.
Scope
This consultation sets out AEMO's proposal on inputs, processes and outputs to the ST PASA engine for the purpose of declaring reserve conditions under NER 4.8.4.
AEMO has established the ST PASA Replacement Project under NEM Reform to implement system and procedure changes collaboratively with industry.
-
First stage
-
Second stage
-
Final report
Submissions
-
19/03/2026
Mercuria Commodity Markets - ST PASA Replacement Project - Reserve Level Declaration Guidelines
338.22 KB -
19/03/2026
Origin Energy - ST PASA Replacement Project - Reserve Level Declaration Guidelines
232.63 KB -
19/03/2026
Shell Energy - ST PASA Replacement Project - Reserve Level Declaration Guidelines
163.88 KB -
19/03/2026
Snowy Hydro - ST PASA Replacement Project - Reserve Level Declaration Guidelines
194.24 KB -
19/03/2026
Stanwell -ST PASA Replacement Project - Reserve Level Declaration Guidelines
155.03 KB
-
23/04/2026
Draft Report
637.07 KB -
23/04/2026
Draft Reserve Level Declaration Guideline
416.61 KB -
23/04/2026
Draft Report Attachment - Initial Backcasting Report
843.14 KB -
23/04/2026
Draft SO_OP_3703 Short Term Reserve Management
473.59 KB -
01/04/2026
NEM Extension of Time Notice ST PASA Consultation 2 Draft Report
313.6 KB