AEMO has published its Final Report to conclude the consultation process on amendments to the Retail Electricity Market Procedures under the National Electricity Rules (NER), which relate to:
- The implementation of the Rule of the Australian Energy Market Commission (AEMC) on Shortening the Settlement Cycle (SSC).
- Amendments to Retail Electricity Market Glossary and Framework following recent IEC consultations.
- AEMO annual review of NSLP floor value.
-
First stage
-
Second stage
-
Final stage
First stage submissions
-
14/11/2025
AGL
349.29 KB -
14/11/2025
Alinta
354.21 KB -
14/11/2025
Ausgrid
276.7 KB -
14/11/2025
Bluecurrent
356 KB -
14/11/2025
Citpower and Powercor
1008.74 KB -
14/11/2025
Energy QLD
243.84 KB -
14/11/2025
Evoenergy
239.32 KB -
14/11/2025
Intellihub
392.92 KB -
14/11/2025
Origin Energy
352.09 KB -
14/11/2025
PLUS ES
477.38 KB -
14/11/2025
Red Lumo
231.38 KB -
14/11/2025
SA Power Networks
371.01 KB -
14/11/2025
United Energy
1008.8 KB
Procedures (change marked)*
1. The implementation of the Rule of the Australian Energy Market Commission (AEMC) on Shortening the Settlement Cycle (SSC)
3. Amendments to Retail Electricity Market Glossary and Framework following recent IEC consultations
*Change Marked Procedures for 2. Proposed changes to B2M Meter Hazard and B2M Meter Location fields and 4. AEMO annual review of NSLP floor value will be provided at the Draft Report stage.
Second stage submissions
-
29/01/2026
AGL
217.36 KB -
29/01/2026
Alinta
363.09 KB -
29/01/2026
Bluecurrent
362.43 KB -
29/01/2026
Citipower and Powercor
499.78 KB -
29/01/2026
Energy QLD
1.63 MB -
29/01/2026
Evoenergy
347.58 KB -
29/01/2026
Intellihub
343.78 KB -
29/01/2026
Jemena
346.16 KB -
29/01/2026
Origin
340.94 KB -
29/01/2026
Plus ES
472.54 KB -
29/01/2026
Red Lumo
201.29 KB -
29/01/2026
SA Power Networks
398.45 KB -
29/01/2026
United Energy
501.04 KB
Second stage consultation documents
Procedures (change marked)
1. The implementation of the Rule of the Australian Energy Market Commission (AEMC) on Shortening the Settlement Cycle (SSC)
2. Proposed changes to B2M Meter Hazard and B2M Meter Location fields
3. Amendments to Retail Electricity Market Glossary and Framework following recent IEC consultations
4. AEMO annual review of NSLP floor value
Procedures
1. The implementation of the Rule of the Australian Energy Market Commission (AEMC) on Shortening the Settlement Cycle (SSC)
-
09/03/2026
MSATS Procedures - MDM Procedure v4.81 (Changes Marked)
894.22 KB -
09/03/2026
MSATS Procedures - MDM Procedure v4.81 (Clean)
873.16 KB -
09/03/2026
Service Level Procedure MDP Services v2.52 (Changes Marked)
817.45 KB -
09/03/2026
Service Level Procedure MDP Services v2.52 (Clean)
776.42 KB -
09/03/2026
UFE Reporting Guidelines v1.1 (Changes Marked)
1.03 MB -
09/03/2026
UFE Reporting Guidelines v1.1 (Clean)
1.03 MB