General Power System Risk Review

In accordance with rule 5.20A of the National Electricity Rules (NER), AEMO is required to undertake a General Power System Risk Review (GPSRR) and prepare a GPSRR report for the National Electricity Market (NEM) at least annually. From 2023, the GPSRR replaces and expands on the scope of the previous Power System Frequency Risk Review (PSFRR).

View previous PSFRRs

The GPSRR is an integrated, annual review of major power system risks in the National Electricity Market (NEM). The purpose of the GPSRR is to review:

  • A prioritised set of risks comprising contingency events and other events and conditions that could lead to cascading outages or major supply disruptions.
  • The current arrangements for managing the identified priority risks and options for their future management.
  • The arrangements for management of existing protected events and consideration of any changes or revocation.
  • The performance of existing emergency frequency control schemes and the need for any modifications.

Current status

AEMO is currently working on the 2026 GPSRR and has published the draft report for consultation until Friday 26 June 2026. More information, including details on the draft report webinar, is available on the consultation page.

Draft 2026 GPSRR report consultation

For any enquiries, please contact AEMO at: [email protected]

2026 GPSRR

2026 GPSRR report

2026 GPSRR approach

Previous GPSRRs

X
Cookies help us improve your website experience.
By using our website, you agree to our use of cookies.
Confirm